27–28 Jan 2014
Asia/Tokyo timezone

Session

J-PARC and Beamline

27 Jan 2014, 09:30

Presentation materials

There are no materials yet.

  1. Dr Taku Ishida (KEK)
    27/01/2014, 09:30
    Neutrino Beamline
    Status of the J-PARC accelerators / neutrino facility and their upgrade plans
    Go to contribution page
  2. Prof. Tord Ekelof (Uppsala University)
    27/01/2014, 10:00
    Neutrino Beamline
    We are making a Design Study of a neutrino Super Beam long base line (500 km) experiment ESSnuSB based on the use of the European Spallation Source (ESS) 5 MW, 2 GeV proton linac and a Megaton water Cherenkov detector to discover leptonic CP violation, performing measurements at the second oscillation maximum, where the sensitivity to CP violation is significantly higher than at the first...
    Go to contribution page
Building timetable...