Conveners
Accelerators and Beamline
- Tsuyoshi NAKAYA (Kyoto)
-
Dr Taku Ishida (KEK)20/07/2014, 14:40Recent operational status of the accelerators at J-PARC will be reviewed, and necessary steps towards achieving the design 750 kW beam power, and further ideas to realize MW-class beam operation, will be presented.Go to contribution page
-
Dr Tetsuro Sekiguchi (KEK)20/07/2014, 15:00The J-PARC neutrino beamline has had beam operation in the period May-June 2014 after a year long shutdown. Several beamline components were upgraded during the shutdown. The main upgrade was a replacement of all three magnetic horns. The new magnetic horns were upgraded to improve the acceptable beam power and to solve some known problems. The operation status of the neutrino beamline will be...Go to contribution page
-
Dr Yuichi Oyama (KEK)20/07/2014, 15:20Upgrade plan of the neutrino beam-line for multi-MW beam in coming several years is reported.Go to contribution page
-
Dr Daniel Winklehner (MIT)20/07/2014, 15:40The proposed Decay-At-rest Experiment for δCP violation At the Laboratory for Underground Science (DAEδALUS) and the Isotope Decay-At-Rest experiment (IsoDAR), search for CP violation in the neutrino sector and sterile (non-interacting) neutrinos. Both are short baseline experiments that use proton driver beams. In the IsoDAR case, a 60 MeV proton beam will impinge on a high purity...Go to contribution page