19–22 Jul 2014
University of British Columbia
Canada/Pacific timezone

Recent status of J-PARC neutrino beamline

20 Jul 2014, 15:00
20m
Irving K Barber Learning Centre Room 182 (University of British Columbia)

Irving K Barber Learning Centre Room 182

University of British Columbia

Vancouver, BC CANADA

Speaker

Dr Tetsuro Sekiguchi (KEK)

Description

The J-PARC neutrino beamline has had beam operation in the period May-June 2014 after a year long shutdown. Several beamline components were upgraded during the shutdown. The main upgrade was a replacement of all three magnetic horns. The new magnetic horns were upgraded to improve the acceptable beam power and to solve some known problems. The operation status of the neutrino beamline will be presented.

Primary author

Presentation materials