Speaker
Dr
Tetsuro Sekiguchi
(KEK)
Description
The J-PARC neutrino beamline has had beam operation in the period May-June 2014 after a year long shutdown. Several beamline components were upgraded during the shutdown. The main upgrade was a replacement of all three magnetic horns. The new magnetic horns were upgraded to improve the acceptable beam power and to solve some known problems. The operation status of the neutrino beamline will be presented.
Primary author
Dr
Tetsuro Sekiguchi
(KEK)