Speaker
Dr
Taku Ishida
(KEK)
Description
Recent operational status of the accelerators at J-PARC will be reviewed,
and necessary steps towards achieving the design 750 kW beam power, and
further ideas to realize MW-class beam operation, will be presented.
Primary author
Dr
Taku Ishida
(KEK)